1.1
13
in size.
Stew (4). Filter Reds of double the area proposed
aAl 477 more than originally required to deal with the increased supply which is contemplated under the new scheme.
1 (5)-(9) The increases are 4 (10). 4 (11). to cover the required the enhanced cost of materials and labour.
Thely states nocent originally merely was a secured; that now stated is based upon actual survey and measurement.
The Road Diversion is re-rendered necessary by the altered position of the drain, which will interfere with the old path leading to Tai Po and other villages. The original site off the Jam caused no interference with this path.
With regard to (10) Purchase of cultivated Ground I may mention, that compensation paid for cultivated land required for the construct of the Tai To Road generally at the rate of $0.01 per sq. ft. or $436 per acre. I consider this amount rate altogether excessive and have taken a rate of $225 per acre or about $0... per sq. ft.
1
Page 480
Page 481
1.1
13
in size.
Stew (4). Filter Reds of
double the area
proposed
aAl
477
more than
originally required to deal
with the increased supply which is contemplated a
der the new se
scheme.
1 (5)-(9) The increases are
4 (10).
4 (11).
to cover the
required
the enhanced cost
of materials and labour-
Thely
states
nocent originally merely
was
a secured;
that now stated is based
upou actual survey and
measurement.
The Road Diversion is rew
-dered necessary by the allered position of the dain, which will interfere with the old path leading
to Tai Po and other villages.
The original
site off
the Jam caused no
With interprence with this path regard to (10) Purchase of cultivated Ground I may mention, that compensation. paid for
sou
lva s
cultivated land required for the construct of the Tai To Road generally at the of:01 & per sq. ft. or $436 per acre. I consider this amenent
rate
altogether excessive and have taken
a rate
fer acre or about
of $225 per
Y