CO129-307 - Governor Sir Blake - 1901 [10-12] — Page 480

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

1.1

13

in size.

Stew (4). Filter Reds of double the area proposed

aAl 477 more than originally required to deal with the increased supply which is contemplated under the new scheme.

1 (5)-(9) The increases are 4 (10). 4 (11). to cover the required the enhanced cost of materials and labour.

Thely states nocent originally merely was a secured; that now stated is based upon actual survey and measurement.

The Road Diversion is re-rendered necessary by the altered position of the drain, which will interfere with the old path leading to Tai Po and other villages. The original site off the Jam caused no interference with this path.

With regard to (10) Purchase of cultivated Ground I may mention, that compensation paid for cultivated land required for the construct of the Tai To Road generally at the rate of $0.01 per sq. ft. or $436 per acre. I consider this amount rate altogether excessive and have taken a rate of $225 per acre or about $0... per sq. ft.

1

Page 480

Page 481

Edit History

2026-06-01 02:42:58 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
1.1 13 in size. Stew (4). Filter Reds of double the area proposed aAl 477 more than originally required to deal with the increased supply which is contemplated under the new scheme. 1 (5)-(9) The increases are 4 (10). 4 (11). to cover the required the enhanced cost of materials and labour. Thely states nocent originally merely was a secured; that now stated is based upon actual survey and measurement. The Road Diversion is re-rendered necessary by the altered position of the drain, which will interfere with the old path leading to Tai Po and other villages. The original site off the Jam caused no interference with this path. With regard to (10) Purchase of cultivated Ground I may mention, that compensation paid for cultivated land required for the construct of the Tai To Road generally at the rate of $0.01 per sq. ft. or $436 per acre. I consider this amount rate altogether excessive and have taken a rate of $225 per acre or about $0... per sq. ft. 1 Page 480 Page 481
Baseline (Original)
1.1 13 in size. Stew (4). Filter Reds of double the area proposed aAl 477 more than originally required to deal with the increased supply which is contemplated a der the new se scheme. 1 (5)-(9) The increases are 4 (10). 4 (11). to cover the required the enhanced cost of materials and labour- Thely states nocent originally merely was a secured; that now stated is based upou actual survey and measurement. The Road Diversion is rew -dered necessary by the allered position of the dain, which will interfere with the old path leading to Tai Po and other villages. The original site off the Jam caused no With interprence with this path regard to (10) Purchase of cultivated Ground I may mention, that compensation. paid for sou lva s cultivated land required for the construct of the Tai To Road generally at the of:01 & per sq. ft. or $436 per acre. I consider this amenent rate altogether excessive and have taken a rate fer acre or about of $225 per Y 옳다 1 Page 480Page 481
2026-06-01 02:42:58 · Baseline
View content

1.1

13

in size.

Stew (4). Filter Reds of

double the area

proposed

aAl

477

more than

originally required to deal

with the increased supply which is contemplated a

der the new se

scheme.

1 (5)-(9) The increases are

4 (10).

4 (11).

to cover the

required

the enhanced cost

of materials and labour-

Thely

states

nocent originally merely

was

a secured;

that now stated is based

upou actual survey and

measurement.

The Road Diversion is rew

-dered necessary by the allered position of the dain, which will interfere with the old path leading

to Tai Po and other villages.

The original

site off

the Jam caused no

With interprence with this path regard to (10) Purchase of cultivated Ground I may mention, that compensation. paid for

sou

lva s

cultivated land required for the construct of the Tai To Road generally at the of:01 & per sq. ft. or $436 per acre. I consider this amenent

rate

altogether excessive and have taken

a rate

fer acre or about

of $225 per

Y

옳다

1

Page 480Page 481